NOTICE is hereby given, pursuant to Section 32 of the Road Traffic Act 1961, that the City of Holdfast Bay has resolved to close a road, known as an unnamed public laneway that runs north-south between Strickland Road and Seaview Avenue, Kingston Park (‘the laneway’) for the purposes of restricting the flow and impact of traffic within the laneway and on nearby roads.
The closure takes effect on 15 August 2025 and will be effected by the use of traffic control devices placed at the northern and southern ends of the closed portion of the laneway and the laneway’s intersection with another unnamed laneway that runs east-west between the laneway and Barton Avenue
Major construction works as part of the Transforming Jetty Road Glenelg project will begin on Monday 4 August 2025. This includes temporary restrictions on vehicle access to sections of Jetty Road until the end of December 2025, as well as other temporary changes to side streets.
Jetty Road
Starting 4 August 2025, Jetty Road will be temporarily closed to vehicles west of the junction with Nile Street to Moseley Square.
This will allow the roadway and footpaths to be constructed at the same level, which is a unique feature of the western end of Jetty Road, and includes part of Moseley Street and Colley Terrace up to the Hope Street junction.
The traffic lights at the intersection of Jetty Road and Moseley Street will also be installed at this time.
There will be one-way vehicle access onto Jetty Road via a right-hand turn from Moseley Street.
Vehicles will travel east on Jetty Road and will exit Jetty Road by turning left into Sussex Street.
Vehicles entering Jetty Road from Brighton Road can travel west along Jetty Road up until Waterloo Street, where they will be directed to turn right.
The construction team will coordinate and ensure access to emergency services at all times.
The City zone of Jetty Road, which is the section west of Brighton Road to the Partridge / Gordon streets intersection, remains open to vehicles and pedestrians as normal.
Moseley Street, High Street and Elizabeth Street
There will be no change to traffic flow on High Street or Elizabeth Street.
Moseley Street will become one-way for northbound traffic, just north of Elizabeth Street.
Colley Terrace
Colley Terrace will be closed at Hope Street, with a turnaround area implemented.
Local traffic will be permitted access up to the corner of Moseley Square, which includes visitors to Colley Towers and delivery vehicles.
Durham Street
Durham Street will remain one-way southbound between Augusta Street and Chittleborough Lane, with no vehicle access south of Chittleborough Lane.
Traffic will be directed to turn left into Chittleborough Lane towards Sussex Street, with a left-turn into Sussex Street.
Sussex Street
Traffic will turn into Sussex Street from Jetty Road.
Traffic will also exit left into Sussex Street from Chittleborough Lane.
Sussex Street, south of Augusta Street, will be two-way for local traffic only. There will be no exit from Sussex Street onto Jetty Road.
Two car parks on the eastern side of the street, near the closure point, will be temporarily removed to allow for a vehicle turnaround area.
The loading zone on Sussex Street near Chittleborough Lane will be retained.
Milton Street
Milton Street will convert into a two-way street west of Chapel Street through to the corner (near Dante’s Deli).
The St Mary’s Memorial School drop-off zone will be maintained on Milton Street. Parking west of the drop-off zone, and parking on the northern side of the street will be temporarily removed to facilitate the two-way traffic movement.
Soal Street
Soal Street will convert into a two-way street but for local traffic only. There will be no entry to or exit from Jetty Road.
A concrete median at the junction of Soal Street and Augusta Street will be removed to help facilitate the two-way traffic movement.
Any changes to kerbside bin collections will be communicated as soon as possible.
Nile Street
There will be no entry to or exit from Jetty Road.
Access to the Coles car park will operate as normal. All other parking on the street will be retained including an accessible car park located at the southern end of Nile Street near Jetty Road.
The current loading zone, near Waffle King, will be temporarily moved 3 metres north.
Gordon / Partridge Street
No changes to the road operations of Gordon / Partridge Street and the two Partridge Street car parks will remain open and accessible.
Commercial waste collections
Businesses within the road closure areas will receive direct communications next week regarding minor changes to commercial waste collections.
All other businesses that are not within the road closure areas will continue to have their commercial waste collected as usual.
Temporary changes to bus services
There will be temporary re-routing of some bus services between August and December 2025.
Buses will continue to service Moseley Street and in lieu of Jetty Road, they will travel along High Street towards Partridge / Gordon streets.
Buses will be redirected from Colley Terrace to Anzac Highway with stops near Wigley Reserve.
Please refer to Adelaide Metro website for up-to-date timetables and routes.
It’s anticipated that bus services will return to normal by the end of December once Jetty Road has reopened to vehicle traffic.
Pedestrian access to businesses
Pedestrian access will be maintained along the entire street during each phase of construction, via temporary walkways or ramps as needed.
From late August 2025
The road closures will extend towards Partridge / Gordon streets intersection, with more details to be communicated closer to that time.
End of December 2025
The construction work on Jetty Road will be complete and the road will be reopened to vehicles.
Work will continue into the side streets, on the footpaths and gardens beds, with the project expected to be completed in the second half off 2026.
Schedule of works
The above information, including the proposed dates for construction and program of works, is correct at this time.
We are continuing to work through the detail and refine plans to ensure access to Jetty Road businesses is retained and traffic can move around the precinct as freely as possible.
However, if there are significant changes, these will be communicated.

This notice informs residents and road users of upcoming essential road works on Scholefield Road, Seacliff. Villawood Properties is undertaking these works as part of the Seacliff Heights Commercial & Residential Development and will involve installing a new roundabout.
Project and Schedule:
- Works: Installation of a new roundabout on Scholefield Road.
- Developer: Villawood Properties
- Contractors: DML Constructions Pty Ltd
- Start Date: Thursday, 14 August 2025
- Expected Completion Date: Wednesday, 17 September 2025 (close of business), weather permitting.
Traffic Management and Access:
- Through Traffic: Scholefield Road will be closed to all through traffic between Newland Avenue and Ocean Boulevard.
- Resident and Business Access: Access will be maintained for residents and businesses located within the closed section of Scholefield Road. Please follow on-site traffic management directions.
- Detour Route: All other traffic will be detoured via Kauri Parade to Wheatland Street, and then onto Brighton Road. Please follow the marked detour signs.
Due to the scope of work required, this full closure is the safest and most timely method to complete the roundabout installation and minimise overall disruption.
For further information or enquiries regarding these private works, please contact:
- DML office: 8357 4041
- Villawood Properties: 1300 515 194
Temporary Event Road Closures
Road Closure Information is as follows:
- Adelphi Terrace, Glenelg North between St Annes Terrace and Anzac Highway
- Anzac Highway, Glenelg North between Colley Terrace and Gordon Street (SOUTHERN carriageway)
- Anzac Highway, Glenelg North between Colley Terrace and Adelphi Terrace (NORTHERN carriageway)
- Colley Tce, Glenelg between Hope Street and Anzac Highway
Between 4am and 2pm
- Anzac Highway, Glenelg North between Gordon Street and Brighton Road (SOUTHERN carriageway)
- Anzac Highway, Glenelg East between Marion Road, and Gordon Street (SOUTHERN carriageway)
- Augusta St, Glenelg between Gordon Street and Eitzen Street
- Brighton Rd, Glenelg between Anzac Highway and Jetty Road (EASTERN carriageway)
- Gordon Street, Glenelg between Anzac Highway and Jetty Road
- Eitzen Street, Glenelg between Anzac Highway and Jetty Road
- Maxwell Tce, Glenelg East between Brighton Road, and Fortrose Street
- Jetty Road, Glenelg between Gordon Street and Brighton Road
Between 5.30am and 12.30pm
- Chappell Drive, Glenelg Northwest of Colley Terrace and Anzac Highway
Between 5.45am and 2pm
No Parking in the Central section of Anzac Highway outside the Watermark Hotel 4am – 12.30pm